day 1472 – corridor floor

third day of the contractor laying down hardwood floor. it’s coming along nicely; he’s working slowly but diligently as those curved steps on the stairs is complicated. i hope he can get more done over the weekend so i don’t have to deal with the sawdust. it’s looking quite nice but i still don’t like how the random creaking noises comes with. no matter what, i think i’ll always prefer carpet in my bedroom

Advertisements

day 1432 Р strathcona 

it was neat to spectate a strathcona and china team basketball game. up until halftime was a good paced game and close matchup. it’s been a long time since i last played or5ganized basketball. it brought back a lot of memories of the hamber hardwood days and how i wished it never ended. i really do miss it but i was told to give it up for the sake of my knee. even though my knee has gotten stronger through the years of rebuilding it, i’ll forever be reminded how long and hard that road was