day 1658 – plant for a day

it’s a statutory holiday but here i am putting in work and getting dusty in the icon plant because they need it. it was labour intensive work with lots of loading, lifting, carrying and cutting. though i have no intention to work in a plant, i acquired new skills such as routering, edge banding, spraying, laminating and cnc-ing; all these will help me do and understand my job better. in the end i even cut and assembled a foot stool for my own desk. it was loud with all the machines and fans running, appreciation for the plant workers who can withstand eight hours of this noise

day 540 – mri

image

i find that hospitals are always so poorly labelled i am never able to find what i am intending to do. either that or st paul’s hospital is designed to be an intended maze. i probably spent a good twenty minutes and walked through the entire first and second floor before finding the radiology centre. i had to stay stillĀ for the duration of the scan with my arm and wrist fixed in strap and stuck in a vacuum-like tube that constantly emitted loud beeping sounds, but somehow i was able to fall asleep throughout all that. i must be tired