day 2010 – test render

modeling and rendering my own bedroom as my first official test render. been talking to my manager about doing renderings for ages, but could never peel me off the work load. with the latest transition, his promise still stands. my manager and i agreed that this will be the perfect time to finally do what i’ve been wanting – model and render. the test render came out with a result so satisfyingly real. this will be the first of many and each one will only get better

day 1576 Рpre black friday 

getting in early on the pre black friday sale which is pretty high on my shopping list. the first of many items i bought is a pillow that’s big enough i can comfortably with miumiu. a pillow i should have bought long ago that will serve me better and rid some of my sleeping woes and neck pain. i can’t wait until the rest of my stuff comes in to complete my makeover

 

day 1472 – corridor floor

third day of the contractor laying down hardwood floor. it’s coming along nicely; he’s working slowly but diligently as those curved steps on the stairs is complicated. i hope he can get more done over the weekend so i don’t have to deal with the sawdust. it’s looking quite nice but i still don’t like how the random creaking noises comes with. no matter what, i think i’ll always prefer carpet in my bedroom